Masdar CCS Project

From SourceWatch
Jump to navigation Jump to search
This article is a stub. You can help by expanding it.
{{#badge:
 graphic position=top |
 background=FFF |
 border=BA2725 |
 image=/images/a/aa/Coalswarm_badge.gif |
 width=216 |
 height=60 |
 title=Portal:Coal Issues |
 link=http://coalswarm.org |
text=This article is part of the Coal Issues portal on SourceWatch, a project of Global Energy Monitor and the Center for Media and Democracy. See here for help on adding material to CoalSwarm.}}

The Masdar CCS Project is a proposal to "capture carbon dioxide from power plants and industrial facilities and then transport it via a UAE [United Arab Emirates] wide pipeline network for injection into Abu Dhabi’s oil reservoirs for Enhanced Oil Recovery (EOR). The first phase of the project is currently in the front-end engineering and design stage and upon completion in late 2014 will capture 5 million tonnes of CO2 per year."[1]

Articles and resources=

References

  1. Masdar, "Masdar Signs MOU with the Province of Alberta", Media Release, January 20, 2010.

Related SourceWatch articles

External resources

External articles